Day 53
Jigsaw interrupted. We hit the ground running, unfortunately we didn't get far. I went over a couple things that needed to be fixed with the guys, and determined that the cabinet over the fridge was indeed missing.
I called Builder's Cabinet Supply as soon as they opened and the manager saw that the cabinet was on the layout but didn't make it on the work order. He said he could build the cabinet today and have it delivered by the afternoon. That is one serious benefit of dealing with a local builder. The guys put in the lower cabinets (making our concern about crowding the window go away) until lunch, and the fridge cabinet came around 2:00.
There is a strange piece of door trim on the side of the broom closet, but only goes 2/3 of the way up. That and the guys (and us) are confused about how the crown molding supplied is supposed to go on. I finally tracked down the sales person from the cabinet shop at 4:00 and she said she would come over Tuesday morning to straighten the rest of this out. At the end of the day, we were short five doors, two pieces of glass and side trim for the broom closet. A workable status I suppose.
And, we got the stove and hutch off the porch-- reclaimig another piece of the house.
No comments:
Post a Comment